7.3L Powerstroke HEUI Injector Set of 8 (7× AD + 1× AE Long-Lead) | Alliant Power, 1999.5-2003 Super Duty

$3,848.00

7.3L Powerstroke HEUI Injector (AD) | Alliant Power AP63803AD New, 1999.5-2003 × 7

New Alliant Power standard AD injector for 1999.5-2003 Ford 7.3L Powerstroke, cylinders 1-7. Part AP63803AD. Ships by UPS to all 50 states, including Alaska and Hawaii. Your rate shows at checkout. Refundable core charge applies.

$381.00 each

Core Charge - 7.3L Powerstroke Injector AP63803AD (Refundable) × 7

$100.00 each

7.3L Powerstroke HEUI Injector (AE Long-Lead) | Alliant Power AP63804AE New, 1999-2003

New Alliant Power AE long-lead injector for 1999-2003 Ford 7.3L Powerstroke (cylinder 8 on 99.5-03 trucks). Part AP63804AE. Ships by UPS to all 50 states, including Alaska and Hawaii. Your rate shows at checkout. Refundable core charge applies.

$381.00

Core Charge - 7.3L Powerstroke Injector AP63804AE (Refundable)

$100.00

View Core Charge & Return Policy

The correct full injector set for a late 7.3L, and the one most kits get wrong. A 1999.5-2003 Super Duty takes seven AD injectors in cylinders 1-7 plus one AE long-lead in cylinder 8; the long-lead (LL) injector has a blue connector and a different plunger, and a generic “set of 8” that skips it leaves you with the classic 7.3 idle cackle. This set ships the exact 7 + 1 mix, all new OE units.

Set contents7 × AP63803AD (cylinders 1-7) + 1 × AP63804AE long-lead (cylinder 8)
BrandAlliant Power
ConditionNew (OE new, not remanufactured)
Application1999.5-2003 Ford 7.3L Powerstroke Super Duty (engines built after 12/07/1998)
Core chargeRefundable in full when we receive your 8 rebuildable cores

Fits / Applications

  • 1999.5-2003 Ford F-250/F-350/F-450/F-550 Super Duty and Excursion 7.3L Powerstroke
  • Engines built after 12/07/1998 (the AD/AE late-injector trucks)
  • Cylinders 1-7 use the AD; cylinder 8 uses the AE long-lead. This set is the correct 7 + 1 combination
  • Ford 1999-2003 F Series, E Series, 7.3L Power Stroke
  • International/Navistar 1999-2003 T444E 843,990 to 5,999,999

Cross Reference: Part Numbers This Covers

AP63803AD (×7)  ·  AP63804AE (×1)  ·  HEUI late 7.3L

Why do I see this injector cheaper online?
Short answer: it is usually not the same part, and on a 7.3L you pay for that twice in labor. Read why ↓

Search any OE number and eBay, Amazon and a dozen storefronts will show it well under dealer cost, sold by outfits with no name, no address and no phone number. We lose business to those listings every week, and we see a lot of them come back through our shop. Here is what is actually different.

  • The part number proves nothing on its own. Counterfeit injectors and pumps are stamped with the same OE numbers as the real thing, in housings cast to look identical. The number in the listing title tells you what the seller claims it is, not what came off an OE line.
  • “Remanufactured” is not a regulated word. A genuine reman unit is stripped to bare components, has its wear parts replaced (nozzle, plunger and barrel, solenoid, seals) and is then run on a calibration bench until it meets the original flow and response spec. A cheap one is very often cleaned, resealed, painted and shipped. Both get called remanufactured.
  • No full teardown, so no idea what is worn. A proper rebuild means the unit comes apart completely and every part gets inspected and measured against spec, not just the ones that are obviously bad. Skip the teardown and you are reusing worn internals inside a freshly painted housing. It will run on the truck. It will not last.
  • No factory-spec bench load testing. A unit is not finished until it has been run under load on a test bench and made its numbers across the range, not just at one easy point. That bench time is most of what you are paying for. Sellers working on price cut it first, because nobody can see it in a photo.
  • The warranty has to be honored by someone. Everything we remanufacture in house carries a one-year warranty, with 30 days on electrical components. Parts we supply as an authorized dealer carry the manufacturer’s own warranty. Either way you call us, a real shop in California, and we sort it out. A marketplace warranty usually means shipping the part overseas at your own cost and hoping for a reply.
  • No core program. We credit your rebuildable core back in full. Discount sellers generally will not take one, so the gap narrows the moment you account for the core you are now stuck holding.
  • The part is the cheap part of this job. On a 7.3L you are pulling valve covers and working under the oil rail. On a 6.7L the cab may have to come off. Doing that labor twice because one bargain injector failed costs far more than the difference you saved on all eight, and a failing injector can wash a cylinder or put debris through the fuel system on its way out.

We are an authorized Alliant Power dealer and a working fuel-injection shop. We have been rebuilding and testing this hardware in Woodland since 1993, and the people who answer the phone are the people who run the benches. Not sure this is the right part for your engine? Call us with your serial number before you order and we will confirm it. Send your rebuildable core back and the core charge is refunded. And if a price somewhere else looks too good, call 530-668-0818 and we will tell you straight whether it is a deal or a problem.

1823751
1823751C91
1823751RX91
1831487
1831487C92
1831487C93
1831488
1831488C1
1831489
1831489C1
1831489C12
1831550
1831550C1
1831550C14
1831551
1831551C1
1831551C13
2J205
3H595839
502502
5C3Z9VE527
5C3Z9VE527BRM
63803
7.4HM2U1656343
7002PP
722504
AP63804AD
CMR8RM
DA2251452
DISAP63803AD
EX63803
EX63803AD
F81Z9E527
F81Z9E527CRM
FJ738
FJ7388PCK
FLTFI1831487
HEUIAD

Related Parts

Why Buy From Valley Fuel Injection

We are a diesel fuel-injection and turbocharger shop in Woodland, CA, rebuilding pumps, injectors and turbos on our own benches since 1993, not a drop-ship storefront. Not sure which version your engine takes? Call us with your engine serial number before you order and we will confirm it, so you are not opening a full set to find out. Want to confirm before you buy all 8? We flow-test your pulled injectors in-house.

Shipping:
This complete set ships by UPS to all 50 states, including Alaska and Hawaii. Your rate shows at checkout. The set price includes a refundable core deposit for each injector, refunded in full when we receive your 8 rebuildable cores. Questions on fitment? Call 530-668-0818.

Price shown is for the complete set of 8. Any applicable sales tax is additional and shipping is calculated at checkout. The set price already includes the refundable cores. Buying tax-exempt? Qualifying diesel repair shops, fleets, farms, and agricultural operations can purchase tax-free. Set up tax-exempt purchasing once and every qualifying order is tax-free going forward.

Prefer to buy one at a time? Single injector: 7.3L Powerstroke HEUI Injector (AD) | Alliant Power AP63803AD New, 1999.5-2003. Order the single and set your quantity.

7.3L Powerstroke HEUI Injector Set of 8 (7× AD + 1× AE Long-Lead) | Alliant Power, 1999.5-2003 Super Duty
This website uses cookies to improve your experience. By using this website you agree to our Data Protection Policy.
Read more